EngineeredJobsite Isolation
Jupiter · Palm Beach · Fort Lauderdale · Miami · Naples
Full-service temporary floor protection — installed, monitored, and removed by our in-house team.
The Problem We Solve
Finished Floors Should Not Become a Casualty of the Construction Process
The Problem
You've got a $40,000 custom marble floor that just went in. Tomorrow, the millwork crew shows up.
Every trade that walks across that floor is a liability — and none of them care about it the way you do. Scratches happen in minutes. Stains set overnight.
Most GCs throw down a roll of rosin paper and call it protected. It's not. Rosin paper tears, slides, and traps debris underneath — then grinds it directly into the finish every time someone walks on it.
The Solution
Professional protection installed, monitored, and removed by our in-house team.
Protect X uses 4mm and 10mm corrugated polypropylene protection boards — installed correctly, taped at every seam, and pulled cleanly at the end of your project.
"Our cost is a fraction of the damage we prevent. We've seen the invoices."
Why It Works
Why Project Managers and GCs Call Protect X First
Installed by trained crews so your team does not waste time managing it.
What We Use
The Material and Why It's Not the Same as the Other Guys
Protect X installs 4mm and 10mm corrugated polypropylene board — known commercially as Coroplast-style protection board — on all floor surfaces.
4mm Protection Board
Finished surfaces · Light-to-moderate traffic
Used on hardwood, tile, stone, and LVP floors in staging areas, hallways, and living spaces where foot traffic is the primary risk.
10mm Protection Board
High-impact zones · Equipment traffic
Used at entry areas, kitchen footprints, staircase landings, and anywhere rolling equipment or heavy tool staging is expected.
| Weight bearing | Distributes point loads from dropped tools and equipment wheels so the impact never reaches the finish below |
| Non-slip backing | The installed surface protection does not migrate. It stays where you put it |
| Breathable | Moisture doesn't trap underneath and cause warping or adhesion issues on wood floors |
| Zero residue | Seams are fastened with heavy-duty construction tape. No adhesive contacts the finish surface |
| Installs fast | A full floor on a 5,000 sq ft level takes one day. We're not slowing your job down |
Our Process
Full-Service Protection from Day One to Handoff
Service Area
We Cover All of South Florida
From Jupiter and Palm Beach south to Homestead and the Keys — and across to Naples on the Southwest Florida coast.

What They're Saying
From the PMs and GCs Who've Worked With Us
No sales language. Just what happens when the protection comes off and the floor looks perfect.
Real Projects
Projects That Speak for Themselves
Before, after, and full project scope — with the people who hired us saying what happened.
Ready to Protect Your Project?
Your Floors Don't Have to Become
a Casualty of Construction
Start with a 30-minute site visit. We walk the job, we write the scope, we price only what your project actually needs. Crew on-site in as little as 3 days from signed invoice.